Our Projects

Iron Skarn (Optioned for 100%)

Scope:
Project Description:

Tiger Tasman Minerals Iron Skarn Project, located within 40km south‐west of Townsville QLD, is in a mining friendly jurisdiction with access to major infrastructure including road, rail and port. The Iron Skarn project is an acquisition target (100%) with a granted exploration licence covering 12 square kilometres of area, with significant exploration completed by historical vendors including over 5,700m of RC and DDH drilling, geological, geochemical and metallurgical testing. The Iron Glen deposit is a polymetallic skarn with a JORC 2012 inferred resource estimate for magnetite and silver, completed by Terra Search Pty Ltd in 2018. The JORC 2012 resource has formed the basis of an internal conceptual study undertaken by the current vendors for a Dense Media Magnetite (DMM) mining operation with silver concentrate as a prelude to evaluating development options for the Iron Glen resource.

Lead Belly Prospect

The Iron Skarn Project also incorporates the Lead Belly prospect where limited drilling, rock chip and soil sampling by historical vendors has confirmed the presence of polymetallic Pb‐Zn‐Cu‐Ag skarn beneath the Lead Belly outcrop. Helimag airborne magnetic and radiometric coverage of the Lead Belly prospect confirms a significant anomaly in a prospective stratigraphic position.

Future Development & Exploration

Tiger Tasman Minerals exploration strategy for Iron Skarn has been designed with two objectives in mind. (a) Detailed definition drilling, geochemical and metallurgical test work on the Iron Glen JORC 2012 resource to support further studies to evaluate near term development options for a DMM and silver concentrate mining operation; (b) Detailed geophysical, geochemical, target definition and drilling on the Lead Belly prospect. This approach is considered prudent and reasonable given the extensive exploration data set and study work developed on the Iron Skarn Project to date.

Iron Skarn – Flagship Pre-development Project (100%)
(The Independent Technical Assessment Report (ITAR) prepared by IMC Mining Pty Ltd (that forms Annexure A to the Prospectus dated 9/9/22) contains details regarding sources of information and exploration results set out or referred to in this section, which have been derived or summarised from the ITAR for the convenience of readers. The ITAR also contains analysis and other information, including tables and diagrams in respect of exploration results prepared in accordance with the JORC Code and the competent persons’ statement under the JORC Code in respect of those results. The exploration results are based on, and fairly represent, information and supporting documentation prepared by competent persons named in the ITAR)

Menu